Red Metal Limited

NOTE: To use the advanced features of this site you need javascript turned on.

Home Investors ASX Announcements Maronan Project Second Drill Rig Mobilised
Maronan Project Second Drill Rig Mobilised

A second drill rig has been mobilised to site and commenced drilling the first of two proposed deep holes designed to test the vertical continuity and zonation of the mineralisation below MRN13002 and MRN14002.

The first deep hole MRN14004 is designed to intersect the target horizons about 500 metres below the recently reported mineralisation. This hole is expected to take about 6 weeks to complete.

Download this announcement (1040kb pdf)