Red Metal Limited

NOTE: To use the advanced features of this site you need javascript turned on.

Home Investors ASX Announcements Maronan Project Final Assay Results from 2014 Drill Program
Maronan Project Final Assay Results from 2014 Drill Program
Assay results from the remaining holes from the 2014 drill program have returned multiple intervals of moderate lead and silver values in MRN14008 and strong lead and silver values from mineralisation in MRN14004 - the deepest hole in the program.
 
MRN14008 contained 4 separate intervals of mineralisation with the better results including:
24.7 metres from 769.1m grading 4.3% lead, 90g/t silver; including
6.0 metres from 772m grading 7.5% lead, 121g/t silver;
4.0 metres from 849m grading 7.0% lead, 140g/t silver;
10.9 metres from 857.1m grading 4.7% lead, 106g/t silver; including
6.75 metres from 860m grading 6.8% lead, 148g/t silver.
 
These intervals occur over a cumulative true width of about 23.9 metres and are located about 290 metres down plunge of the strong lead and silver mineralisation intersected in MRN13002.
 
Assays from the remanent interval of bedded lead mineralisation in the deep drill hole MRN14004 returned:
3.1 metres from 1241m grading 8.6% lead, 212 g/t silver.
 
Although narrow, the strong silver and lead values are encouraging given the bedded (non-structural) style of mineralisation and the interpreted potential for a thickened hinge region further to the north.
 
All lead, silver, zinc, copper and gold assay results from the 2014 program are summarised in Table 2 in the announcement.